Shoring the rear of the building.
RAPPELLING THE FRONT
A squad lowers a victim from the top floor.
CANINE TRAINING
Gail McCarthy and Harlow rest on site of boiler room collapse.
M-274 MULE
Victim is transported from building by P. O'Connor and the Task Force Mule.
VERTICAL SHORING
Shoring under main floor of building that was loaded with debris from
collapse.
CUTTING STATION
Squad in front of building provides lumber cut to your specification.
No waiting, two chain saw equipped
Rescue Specs ready to go.