SPLITTING BUILDINGS USING RAIL SYSTEM
Part 2


15 Ton Hillman rollers are laid in a 8W31 steel beam.


Beam is inserted under building and then the building is lowered on the Hillman Rollers.


Using a pair of 1.5 ton Grip Hoists, half of the building is slid away.


Trailer toungues are slid under building and bolted to frame.