15 Ton Hillman rollers are laid in a 8W31 steel beam.
Beam is inserted under building and then the building is lowered on
the Hillman Rollers.
Using a pair of 1.5 ton Grip Hoists, half of the building is slid away.
Trailer toungues are slid under building and bolted to frame.